TB-9-2320-280-35-12

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR EPLRS NETWORK MANAGER VEHICLE WITH AMTECH TOP

OCTOBER 2006
CHANGE 1

  TB-9-2320-280-35-12 - Page 30 of 162

TB 9-2320-280-35-12
5-6
2-16.
Locate, mark, and drill two 1.375-in. diameter cable access holes (22) in battery box (2) rear wall.
2-17.
Install grommet material (6) in cable access holes (22).
3.25
1.50
1.50
22
6
2
~
Figure 5-7.


Back to Top