TB-9-2320-302-13-P-3

CREW PROTECTION KIT; AIR CONDITIONING KIT PART 3 OF 3

TECHNICAL BULLETIN; OPERATOR’S, UNIT, AND DIRECT SUPPORT, MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

MARCH 2008

  TB-9-2320-302-13-P-3 - Page 133 of 240

TB 9-2320-302-13&P-3
0019 00-1
RECEIVER/DRYER REPLACEMENT
0019 00
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Maintenance Level
Direct Support
Tools and Special Tools
Tool Kit, General Mechanic’s (Item 9, WP 0024 00)
Shop Equipment, Common No. 1 (Item 6, WP 0024
00)
Reclaimer, Refrigerant (Item 5, WP 0024 00)
Tool Kit, Refrigeration Equipment (Item 10, WP
0024 00)
Materials/Parts
Oil, Lubricating, Refrigerant Compressor (Item 8,
WP 0025 00)
Rag, Wiping (Item 9, WP 0025 00)
Materials/Parts - Continued
Tag, Marker (Item 13, WP 0025 00)
Locknut (1)
O-ring (2)
References
WP 0014 00
Equipment Conditions
Vehicle parked on level ground (TM 9-2320-363-
10)
Parking/Emergency Brake applied (TM 9-2320-
363-10)
Engine OFF (TM 9-2320-363-10)
Ignition Key Switch in OFF position (TM 9-2320-
363-10)
A/C Refrigerant recovered (WP 0015 00)
CAUTION
Cap all A/C hose ends and component connections during removal to protect against contamination. Failure
to comply may cause damage to equipment.


Back to Top