TB 9-2350-277-40&P-1
INSTALLATION PROCEDURES – Continued
0005 00
0005 00-19/20 blank
FOLLOW-THROUGH STEPS
1.
Install power plant rear access panel.
See TM 9-2350-277-20-4.
2.
Install top shelf of vertical ammo rack.
See TM 9-2350-277-20-4.
3.
Close and secure top door of horizontal ammo rack.
END OF WORK PACKAGE