TB-9-2350-277-40-P-1

CARRIER, MORTAR, 120-MM M121, SELF-PROPELLED M1064A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 1 OF 4

JUNE 2009

  TB-9-2350-277-40-P-1 - Page 54 of 100

TB 9-2350-277-40&P-1
INSTALLATION PROCEDURES – Continued
0005 00
0005 00-18
8.
Locate ground strap (29) on the inside of enclosure assembly (79).
Cut the tie strap and route
ground strap out the back of the enclosure assembly (79).
9.
Pull and position ground strap (29) to attach to rear screw (36) on cable guard (35).
10. Remove screw (36), lockwasher (37), and washer (18) from cable guard (35).
Discard
lockwasher.
NOTE
Mount ground strap next to head of screw.
11. Install screw (36), ground strap (29), lockwasher (37), and washer (18) on cable guard (35).
12. Attach enclosure assembly cover (82) to enclosure assembly (79) using four screws (81),
lockwashers (16), and washers (15).
Figure 17.
Ground Strap and Cable Guard Installation


Back to Top