TB-9-2510-251-13

TECHNICAL BULLETIN

OPERATOR AND FIELD MAINTENANCE; INSTALLATION MANUAL (INCLUDING REPAIR PARTS LIST); FOR ADD-ON-ARMOR (AoA) AIR CONDITIONING

AUGUST 2007

  TB-9-2510-251-13 - Page 113 of 624

2-97
TB 9-2510-251-13
2-1.3
Installation of Air Conditioning Kit to M1025 and M1025A1 with GSIE Add-on-Armor
(Cont’d).
d. Install Refrigerant Hoses (Cont’d)
Figure 2-145.
Compressor Connection
(11)
Connect Compressor.
a. Lubricate O-ring and install #8 female 45° or 90° fitting (8) on upper compressor
connection.
b. Lubricate O-ring and install #12 female 90° fitting (9) on lower compressor connection.
c.
Ensure hood of vehicle will close and air intake duct can be reinstalled over
compressor.
d. Trim ends of #8 (10) and #12 (11) hoses to length and connect to fittings.
e. Tighten fittings.
9
11
8
10


Back to Top