TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 316 of 704

TB 9-3950-253-13&P
0030-2
0030
REMOVAL – CONTINUED
1. Attach sling and lifting device to upper lock assembly
(Figure 1, Item 5).
2. Use lifting device to remove slack from sling.
3. Remove two locknuts (Figure 1, Item 2), washers (Figure 1, Item 3), and stop block (Figure 1, Item 4) from lift
frame (Figure 1, Item 1). Discard locknuts.
4. Use lifting device to remove upper lock assembly (Figure 1, Item 5) from lift frame (Figure 1, Item 1).
5. Remove two locknuts (Figure 1, Item 6), washers (Figure 1, Item 7), bolts (Figure 1, Item 10), washers (Figure
1, Item 9), and plate (Figure 1, Item 8) from lift frame (Figure 1, Item 1). Discard locknuts.
Figure 1.
Upper Lock Removal.
030
END OF TASK
1
2
4
3
5
6
7
8
9
10


Back to Top