TM-10-5411-205-13

SHELTER, ELECTRICAL EQUIPMENT - 250/G

TECHNICAL MANUAL; OPERATOR’S, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL

MAY 1995
CHANGE 2

  TM-10-5411-205-13 - Page 76 of 127

TM 10-5411-205-13
3-30.
Louver Cover Assembly Strikes.
This task covers:
Replace
INITIAL SETUP
Tools
General Mechanic’s
Blind Riveter
Automotive Tool Kit
Materials/Parts
Sealer (Item 28, Appendix D)
Replace.
(Figure 3-32)
(1) Remove two countersunk head
each stroke (3) to louver cover,
for rivet removal instructions.)
rivets (1) and one dome head rivet (2) attaching
and remove strike (3). (Refer to paragraph 3-9.a
(2) Position strike (3) on louver cover, Dip mounting rivets in sealer.
(3) Secure strike (3) with two countersunk head rivets (1) and one dome head rivet
(2). (Refer to paragraph 3-9.a for rivet installation instructions.)
Figure 3-32. Louver Cover Assembly Strike Replacement.
3-59


Back to Top