TM-5-2330-378-14-P

SEMITRAILER, LOWBED: 40 TON CONSTRUCTION EQUIPMENT TRANSPORTER M870 AND M870A1

TECHNICAL MANUAL; OPERATOR'S, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

JUNE 1999

  TM-5-2330-378-14-P - Page 148 of 524

TM5-2330-378-14&P
4-32. STOPLIGHT-TAILLIGHTREPLACEMENT
(M870)(continued).
5.
Remove three nuts (7) from studs (8).
6.
Pull stoplight-taillight (2) out of mounting hole (9).
NOTE
Before cuffing wires, tag wires to aid in installation.
Refer to electrical wiring diagram
(Appendix K) for proper installation, if tags get lost.
7.
Cutfourwires
(10-13)from
two connectors (14 and 15).
8.
Remove gasket (16) from mounting hole (9).
b.
INSTALLATION
1.
Put gasket (16) in place on mounting hole (9).
2.
Strip insulation from four wires (10-13) to depth of
connectors (14 and 15).
3.
Install two wires (13 and 11) into connector (15) and
crimp.
4.
Install two wires (10
14
10
and 12) in connector
2
12
(14) and crimp.
13
5.
Install stoplight-
taillight (2) in
mounting hole
(9).
7
9
6.
Install three
8
nuts (7) on
16
studs (8).
15
4
7.
Install gasket (6) on stoplight-taillight
(2).
8.
Push lamp (4) into socket (5) and turn clockwise.
6
9.
Line up screw holes in lens (3) and stoplight-
taillight(2), and install three screws (1) on lens(3)'
3
5
FOLLOW-ON
TASKS:
- None
2
4-60


Back to Top