TM 5-2350-262-20-2
2
3
3
5
5
4
3
Change 3
4-965 (4-966 blank)
PREPARATION FOR NORMAL TRANSPORT
Perform the following tasks if the M9 will be transported by any means other than C-130 or C-141
aircraft.
If the M9 is to be transported by C-130 or C-141 aircraft, refer to TM 55-2350-262-14, Chapter 4.
•
Remove apron and dozer extensions (p 4-260) and stow in bowl.
•
Remove and stow antenna (TM 11-5820-401-10-1).
•
Install lower apron lockpins (TM 5-2350-262-10).
•
Start vehicle engine (TM 5-2350-262-10).
•
Load vehicle onto transporting vehicle (TM 55-2350-262-14, Chapters 5 through 7).
•
Vehicle will be shipped with SPRUNG/UNSPRUNG lever (1) in UNSPRUNG position.
Lower apron (2) (TM
5-2350-262-10) until it touches transporting vehicle platform.
•
Shut off vehicle engine (TM 5-2350-262-10).
Relieve hydraulic pressure (p 3-82).
Leave SPRUNG/
UNSPRUNG control lever (1) in UNSPRUNG position.
•
Close and secure operator’s hatch cover (TM 5-2350-262-10).
•
Take measurements from tiedown points (3) to transporting vehicle platform.
Measure again after 10
minutes to ensure that all hydraulic fluid has leaked from rear actuators to main hydraulic tank.
•
Inspect vehicle to ensure that it rests on rear bump stops (4).
Install blocks (5) and attach tiedowns at
tiedown points (3).