ELECTRICAL SYSTEM - Continued
STEP
6.
Check valve solenoid for continuity.
a.
Disconnect manifold wiring harness (Figure 4, Item 2) from solenoid connector (Figure 4, Item 1) (typical).
b.
Connect positive lead to pin (Figure 4, Item 3) and negative lead to socket (Figure 4, Item 4).
c.
If continuity is indicated, reconnect manifold wiring harness connector (Figure 4, Item 2) to solenoid
connector (Figure 4, Item 1).
Z4L
1
4
3
T00404HBF
2
1
Figure 4.
Valve Solenoid.
CONDITION/INDICATION
Is continuity present at valve solenoid?
DECISION
YES - If continuity is indicated, go to Step (7).
NO - If an open circuit is indicated, replace appropriate valve solenoid. Verify that problem is solved.
TM 5-2350-377-13&P
0012
0012-5