TM-5-2815-241-34-P

ENGINE, DIESEL NTC-290

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT, MAINTENANCE (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

MARCH 1987

  TM-5-2815-241-34-P - Page 103 of 738

TM 5-2815-241-34&P
CROSSHEAD INSTALLATION - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
4. Crosshead (2)
Valve spring
retainer (5)
Using thickness gage, check for minimum
clearance of 0.020 inch (0.51 mm).
5.
Locknut (3) and
adjusting screw (4)
Using 3/8-inch drive ST-669 torque adapter
set, 9/16-inch socket and 0 to 150 ft lb (0
to 210 N•m) torque wrench, tighten to 22
to 26 ft lb (30.8 to 36.4 N•m).
CROSSHEAD LOCATION
TAG NO.
CYL. NO.
VALVE
1
1
EXHAUST
2
1
INTAKE
3
2
INTAKE
4
2
EXHAUST
5
3
EXHAUST
6
3
INTAKE
7
4
INTAKE
8
4
EXHAUST
9
5
EXHAUST
10
5
INTAKE
11
6
INTAKE
12
6
EXHAUST
TASK ENDS HERE
TA 242387
2-81


Back to Top