FIELD MAINTENANCE
DUMP BODY AND STABILIZER REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
General Mechanic's Tool Kit
(WP 0113, Table 1, Item 12)
Engine and Transmission Sling: 3-ton
(WP 0113, Table 1, Item 9)
Shop Set, Machine and Welding
(Tool Kit, Welder's)
(WP 0113, Table 1, Item 8)
Wrench, Torque: 3/4 in. drive, 0–600 lb-ft
(0–813 N•m) (WP 0113, Table 1, Item 17)
Suitable Lifting Device
Materials/Parts
Locknut Qty: 12 (WP 0114, Table 1, Item 18)
Locknut Qty: 2 (WP 0114, Table 1, Item 20)
Personnel Required
(3)
References
TM 9-237
References (cont.)
TM 9-2320-302-10
TM 9-2320-363-10
TM 9-2320-302-20-1
TM 9-2320-302-20-2
TM 9-2320-363-20-1
TM 9-2320-363-20-2
WP 0005
Equipment Condition
Chassis-to-dump body air lines disconnected
(WP 0047)
Chassis-to-dump body electrical harnesses
disconnected (WP 0035) (WP 0031)
(WP 0032) (WP 0033)
Mud flaps removed (WP 0040)
TM 5-3805-264-13&P
0037
0037-1