TM-5-3895-372-20

CONCRETE-MOBILE MIXER BODY M919, MODEL 8CM-24/F

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL

AUGUST 1980

  TM-5-3895-372-20 - Page 206 of 694

TM 5-3895-372-20
6-7.
LIQUID ADMIX SYSTEMS MAINTENANCE TASK SUMMARY (Continued).
LIST OF TASKS
TASK
TASK
TROUBLESHOOTING
NO.
TASK
REF
REF (TABLE)
9.
Liquid Admix Tank Maintenance (Low-Flow):
6-16
6-1
A.
Removal.
6-16A
B.
Repair.
6-16B
C.
Installation.
6-16C
D.
Checking for Leaks.
6-16D
10.
Air Relief Valve Maintenance and Adjustment:
6-17
6-1
A.
Removal.
6-17A
B.
Disassembly.
617B
C.
Inspection.
6-17C
D.
Assembly.
6-17D
E.
Installation.
617E
F.
Adjustment.
617F
11.
Admix Injector Maintenance:
618 61
A.
Removal.
618A
B.
Installation.
-18B
C.
Operational Clock.
6-8C
12.
Dry Admix Bin Maintenance:
6-19
61
A.
Removal.
6-19A
B.
Disassembly.
619B
C.
Cleaning and Inspection.
6-19C
D.
Assembly.
619D
E.
Installation.
619E
F.
Test.-
619F
6-12


Back to Top