TM 5-3895-372-20
6-7.
LIQUID ADMIX SYSTEMS MAINTENANCE TASK SUMMARY (Continued).
LIST OF TASKS
TASK
TASK
TROUBLESHOOTING
NO.
TASK
REF
REF (TABLE)
3.
Flowmeters Maintenance:
6-10
6-1
A. Removal
6-10A
B. Installation. Operational Check.
6-10B
C.
6-10C
4.
Flowmeters Repair:
6-11
6-1
A. Disassembly.
6-11A
B. Cleaning and Inspection.
6-11B
C. Assembly.
6-11C
5.
Flowmeter Hose Maintenance:
6-12
6-1
A. Removal.
6-12A
B. Installation.
6-12B
6.
Flowmeter Valve Maintenance:
6-13
6-1
A. Removal.
6-13A
B. Installation.
6-138
7.
Valves, Lines, and Fittings Maintenance:
6-14
6-1
A. Removal.
614A
B. Inspection.
6-14B
C. Installation
6-14C
D. Checking for Leaks.
6-14D
8.
Liquid Admix Tanks Maintenance (Hi-Flow):
6-15
6-1
A. Removal.
6-15A
B. Repair.
6-15B
C. Installation.
6-15C
D. Checking for Leaks.
6-15D
6-11