TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 518 of 1060

SHIFTING FORWARD CROSS TUBE REPLACEMENT (Sheet 1 of 4)
PROCEDURE INDEX
PROCEDURES
Removal
Disassembly
Inspection
Assembly
Adjustment
Installation
TM 5-5420-202-20-3
PAGE
11-21
11-23
11-23
11-23
11-24
11-24
TOOLS:
9/16 in. combination box and open end wrench (2 required)
Steel tape
Torque wrench with 3/8 in. drive (0-200 lb-in.)
9/16 in. crowfoot adapter with 3/8 in. drive
SUPPLIES:
Paper (Item 72, Appendix D)
Pencil (Item 71, Appendix D)
REFERENCE:
TM 5-5420-202-10
PRELIMINARY PROCEDURE: Block tracks to prevent vehicle movement
(TM 5-5420-202-10)
11-21
Go on to sheet 2


Back to Top