TM-9-1290-365-24-P

PALADIN MUZZLE VELOCITY SYSTEM M93 UPGRADED

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

OCTOBER 2000

  TM-9-1290-365-24-P - Page 213 of 334

ARMY TM 9-1290-365-24&P
WARNING
Do not point the radiating surface towards any personnel. Do not bring eyes to
close contact with the radiating surface. Use absorbing materials in front of the
radiating surface whenever possible.
D.4.12.3.4 2.3.4 Power Consumption Test. Refer to para. D.4.12.3 3.6 for troubleshooting procedures.
a. Turn on the PC.
b. Load MVS software SPC1553.EXE and run it on the PC.
c. Turn on power supply.
d. Verify current measure on power supply 12.350 to 300mA.
D.4.12.3 2.3.5 Transmitted Frequency and Measure Command Test. Refer to para. D.4.13.7 for trouble-
shooting procedures.
a. Turn on frequency counter and set to measure a 1.70GHz frequency range.
b. Place the standard gain horn in front of the transceiver. (Radome side pointing to the standard
gain horn).
c. Press and hold the ACCL. Switch on the test cable, for approximately 30sec and perform para. d.
through h.
d. Verify current from power supply is 500 to 700mA.
e. Verify frequency measurement on frequency counter is 1.70525±1 MHz.
f.
Verify on the oscilloscope that the receiver noise is 0.5Vp-p to 2Vp-p.
g. On the Test Doppler Simulator, set switch P.S.IBAT to BAT position.
Adjust the Doppler Simulator on the Transceiver to get the maximum signal on oscilloscope.
NOTE
h. Verify the signal on the oscilloscope is:
(1) 8Vp-p minimum. The signal shape is approximately a triangle wave due to EMI filter effect.
(2) (2) 455sec period.
i.
Release ACCL. Switch.
j.
Verify current from power supply is 150 to 300mA.
D-43


Back to Top