TM-9-2320-209-10-1

2 1/2-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; OPERATION, INSTALLATION AND REFERENCE DATA; OPERATOR LEVEL

SEPTEMBER 1980

  TM-9-2320-209-10-1 - Page 402 of 549

TM 9-2320-209-10-1
FRAME 2
1.
Boring in disintegrated shale or similar rock requires sharp auger blades (1).
2.
If boring seems slower than usual check auger blade (1) and point (2). If either
or both blade and point are badly worn replace them.
3.
Blades (1) may be good for only 5 to 7 holes when boring in this type of soil.
4.
Auger points (2) may be good for one or two more holes.
5.
If there is too much vibration in derrick tube (3) when boring tell organizational
maintenance.
GO TO FRAME 3
4-348


Back to Top