TM 9-2320-209-10-1
FRAME 5
1.
2.
3.
4.
5.
When auger (1) is loaded, let go of both driver lever (2) and feed lever (3). Levers
will automatically go back to neutral position as shown in (position 1, table 4-3) and
auger will stop.
Pull drive control lever (2) back and push feed control lever (3) forward as shown
in position 5 (table 4-3) to raise auger above ground level.
Move drive control lever (2) into and out of neutral position to spin soil from auger.
Do not press down bumper spring.
Let go of both drive control lever (2) and feed control lever (3) and let levers go back
to neutral position.
Repeat frames 4 and 5 to drill hole as deep as needed.
GO TO FRAME 6
4-342