TM-9-2320-209-10-1

2 1/2-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; OPERATION, INSTALLATION AND REFERENCE DATA; OPERATOR LEVEL

SEPTEMBER 1980

  TM-9-2320-209-10-1 - Page 406 of 549

TM 9-2320-209-10-1
i.
Preparing Boring Machine for Travel.
TOOLS: Pliers
FRAME 1
1. Set engine to idle speed.
2.
Move truck away from hole.
3.
Place feed control lever (1) in NEUTRAL, drive control lever (2) forward
(position 3, table 4-3).
4.
Lower auger (3) until it is resting on top of level ground.
GO TO FRAME 2
4-352


Back to Top