TM-9-2320-209-20-3-1

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; TROUBLESHOOTING; ORGANIZATIONAL LEVEL; VOLUME 3 OF 3; PART 1 OF 4

MAY 1981

  TM-9-2320-209-20-3-1 - Page 755 of 830

TM 9-2320-209-20-3-1
9-5.
TRANSMISSION TRANSFER REVERSE SHIFT LINKAGE CHECK.
TOOLS:
Jack
Wood blocks
SUPPLIES:
None
PERSONNEL:
Two
EQUIPMENT CONDITION: Truck parked, engine off, handbrake set, rear
wheels chocked.
NOTE
Transfer case must be warmed up to operating
temperature before making checks or adjust-
ments on linkage.
Preliminary Procedure. Using jack, raise one front wheel off ground.
Refer to para 11-4.
b.
Transmission Transfer Reverse Shift Linkage Check.
FRAME 1
Soldier A
Soldier B
Soldier A
Soldier B
1.
Put FRONT TRANSMISSION shift lever (1) in R (reverse gear).
2.
Turn front wheel (2) backwards and then try to turn it forward.
Wheel should turn backwards but not forward.
3.
Put FRONT TRANSMISSION shift lever (1) in position 1 (first
gear) .
4.
Turn front wheel (2) forward and then try to turn it backwards.
Wheel should turn forward but not backwards.
5.
If front wheel (2) turns forward in step 2 or backwards in step 4,
do adjustment procedure, para 9-6.
NOTE
Follow-on Maintenance Action Required:
1.
Lower front wheel to ground and remove jack.
Refer to para 11-4.
2.
Take away wood blocks from rear wheels.
END OF TASK
9-45


Back to Top