TM-9-2320-209-20-3-2

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; TROUBLESHOOTING; ORGANIZATIONAL LEVEL; VOLUME 3 OF 3; PART 2 OF 4

MAY 1981

  TM-9-2320-209-20-3-2 - Page 14 of 552

TM 9-2320- 209-20-3-2
CHAPTER 13
BRAKE SYSTEM GROUP MAINTENANCE
Section I. SCOPE
13-1. EQUIPMENT ITEMS COVERED .
This chapter gives equipment maintenance
procedures for the handbrake assembly and related parts, service brake, hydraulic
brake system, mechanical brake system, air brake system, compressed air system,
and trailer brake connections for which there are authorized corrective maintenance
tasks at the organizational maintenance level.
13-2. EQUIPMENT ITEMS NOT COVERED.
All equipment items for which corrective
maintenance is authorized at the organizational maintenance level are covered in
this chapter.
Section II.
HANDBRAKE ASSEMBLY AND RELAYED PARTS
13-3. HANDBRAKE BRAKE DRUM REMOVAL
TOOLS: Pliers
6-inch ruler
Torque wrench, 150 pound-feet
capacity
Container
Adapter, 1/2 inch to 3/4 inch
AND REPLACEMENT.
3/4-inch wrench
1 7/16-inch wrench
1 5/16-inch wrench
1 1/2-inck socket
Flat-tip screwdriver
6-inch adjustable wrench
3-inch extension, 3/4-inch drive Brass punch
Hammer
SUPPLIES: Cotter pin
PERSONNEL: One
EQUIPMENT CONDITION:
Truck parked, engine off,
chocked.
a. Preliminary Procedure. Remove propeller shaft.
10-3.
handbrake set, wheels
Refer to Part 2, para
13-1


Back to Top