TM-9-2320-260-34-1

TRUCK, 5-TON, 6X6, M809 SERIES (DIESEL)

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE; VOLUME 1 OF 2

JULY 1994

  TM-9-2320-260-34-1 - Page 148 of 657

TM 9-2320-260-34-1
3-24. ENGINE AND TRANSMISSION REPLACEMENT (Contd)
FOLLOW-ON TASKS:
Install transmission-to-transfer case propeller shaft (TM 9-2320-260-20).
Install transmission PTO to hydraulic pump driveshaft (if removed)
(TM 9-2320-260-20).
Install cab tunnel, rear tunnel, and toeboard (TM 9-2320-260-20).
Install gearshift lever (TM 9-2320-260-20).
Install surge tank (TM 9-2320-260-20).
Install engine oil dipstick and tube (TM 9-2320-260-20).
Install exhaust muffler (TM 9-2320-260-20).
Install right and left side panels (TM 9-2320-260-20).
Install air cleaner (TM 9-2320-260-20).
Install brush guard and stone guard (TM 9-2320-260-20).
Install lever wind (TM 9-2320-260-20).
Install hood (TM 9-2320-260-20).
Install fuel burning personnel heater (if removed) (TM 9-2320-260-20).
Install personnel hot water heater (if removed) (TM 9-2320-260-20).
Fill coolant system (TM 9-2320-260-20).
Fill transmission oil (LO 9-2320-260- 12).
Fill engine oil (LO 9-2320-260-12).
Close air reservoir draincocks (TM 9-2320-260-20).
Connect battery ground cables (TM 9-2320-260-20).
Adjust accelerator linkage (TM 9-2320-260-20).
Adjust clutch linkage (TM 9-2320-260-20).
CAUTION
Never start a new or repaired engine without performing run-in
starting procedures provided in para. 3-27.
• Perform engine run-in starting procedures (para. 3-27).
• Start engine (TM 9-2320-260-10), allow air pressure to build up to normal
operating range, and check for leaks. Road test vehicle.
3-96


Back to Top