TM 9-2320-260-34-2
15-84. CONTROL CENTER BOX MAINTENANCE (Contd)
FOLLOW-ON TASKS:
●
Install AC manual starter switches (para. 15-89).
●
Install heater thermostat and 10 kW heater thermostat (TM 9-2320-260-20).
●
Connect battery ground cable (TM 9-2320-260-20).
●
Connect external power source (TM 9-2320-260-10).
15-319