FOLLOW-ON MAINTENANCE
1.
Install fan drive clutch actuator. (Volume 3, WP
0446)
2.
Install thermostat and housing. (WP
0288)
3.
Install engine crankcase breather draft tube. (Volume 1, WP
0005)
4.
Install surge tank. (WP
0278)
5.
Fill cooling system to proper level. (WP
0287)
6.
Start engine and check for leaks. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-2
0290
0290-7/8 blank