TM-9-2320-272-23-2

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 2 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-2 - Page 1050 of 1417

FOLLOW-ON MAINTENANCE
1.
Install fan drive clutch actuator. (Volume 3, WP
0446)
2.
Install thermostat and housing. (WP
0288)
3.
Install engine crankcase breather draft tube. (Volume 1, WP
0005)
4.
Install surge tank. (WP
0278)
5.
Fill cooling system to proper level. (WP
0287)
6.
Start engine and check for leaks. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-2
0290
0290-7/8 blank


Back to Top