INSTALLATION - Continued
22.
Install instrument cluster (Figure 10, Item 2) on instrument panel (Figure 10, Item 1) with eight screws
(Figure
10,
Item
3).
M10357DAA
2
3
1
Figure 10.
Instrument Cluster Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Connect CTIS electrical components. (WP
0322)
2.
Connect battery ground cables. (WP
0350)
3.
Start engine and check gauges for proper operation. Check for air leaks at air gauges. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE