INSTALLATION - Continued
15.
Install fresh air control cable (Figure 8, Item 3) and spring nut (Figure 8, Item 2) on blower motor
(Figure
8,
Item
1).
16.
Install cotter pin (Figure 8, Item 7) on heater assembly (Figure 8, Item 1).
17.
Install clamp (Figure 8, Item 5), retaining nut (Figure 8, Item 6), and screw (Figure 8, Item 4) on heater assembly
(Figure 8, Item 1).
M9799DAA
4
5
6
7
3
2
1
Figure 8.
Instrument Cluster Installation.
TM 9-2320-272-23-2
0310
0310-11