INSTALLATION - Continued
4
M9570DAA
1
2
3
2
1
3
5
4
6
7
8
Figure 2.
Main Light Switch Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Connect battery ground cables. (WP
0350)
2.
Check lights for proper operation. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-2
0315
0315-5/6 blank