FOLLOW-ON MAINTENANCE
1.
Install dump spare tire carrier (M929/A1/A2, M930/A1/A2). (WP
0526)
2.
Start engine, allow air pressure to build to normal operating range, and check interlock valve for leaks. Road
test vehicle. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-3
0394
0394-6