TM-9-2320-272-23-4

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 4 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-4 - Page 1140 of 1393

FIELD MAINTENANCE
TRANSMISSION POWER TAKEOFF (PTO) REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
Tool Kit, General Mechanic's: Automotive
(Volume 5, WP
0826, Table 1, Item 56)
Materials/Parts
Cap Set, Protective, Dust and Moisture Seal
(Volume 5, WP
0825, Table 1, Item 13)
Lubricating Oil
(Volume 5, WP
0825, Table 1, Item 44, 45, 46,
47)
Tape, Antiseizing
(Volume 5, WP
0825, Table 1, Item 65)
Cotter Pin
(Volume 5, WP
0827, Table 1, Item 333)
Qty:
1
Materials/Parts (cont.)
Gasket (Volume 5, WP
0827, Table 1, Item 121)
Qty:
1
Locknut (Volume 5, WP
0827, Table 1, Item 277)
Qty:
1
References
Volume 5, WP
0820
Equipment Condition
Parking brake set. (TM 9-2320-272-10)
Transmission PTO-to-hydraulic pump propeller
shaft removed. (WP
0713)
Transmission oil dipstick tube removed.
(Volume 2, WP
0228)
TM 9-2320-272-23-4
0728
0728-1


Back to Top