INSTALLATION - Continued
6.
Remove block of wood (Figure 4, Item 3) from swivel hook (Figure 4, Item 1) and hinged roof
(Figure
4,
Item
2).
1
M5323DAA
2
3
Figure 4.
Hinge Roof and Floor Counterbalance Cable Installation.
7.
Adjust cable tension; turn turnbuckle clockwise to increase tension and counterclockwise to decrease tension.
END OF TASK
FOLLOW-ON MAINTENANCE
Retract and secure van side panel (side door window only). (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-4
0604
0604-6