TM-9-2320-272-23-4

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 4 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-4 - Page 536 of 1393

INSTALLATION
1.
Install nuts (Figure 2, Items 5 and 8) and coupling (Figure 2, Item 1) on conduits (Figure 2, Items 4 and 7).
2.
Install conduits (Figure 2, Items 4 and 7) on van body (Figure 2, Item 6) with six clamps (Figure 2, Item 3) and
screws (Figure 2, Item 2).
M3077DAA
6
3
7
5
2
1
8
4
Figure 2.
Converter Harness Conduit Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install electrical junction box. (WP
0641)
2.
Connect battery ground cables. (Volume 2, WP
0350)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-4
0642
0642-3/4 blank


Back to Top