TM-9-2320-272-23-4

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 4 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-4 - Page 543 of 1393

INSTALLATION
1.
Install two jumper cables (Figure 2, Item 3) and wiring harness (Figure 2, Item 1) on housing
(Figure 2, Item 4) with four screws (Figure 2, Item 2).
2.
Install housing (Figure 2, Item 4) on van ceiling (Figure 2, Item 6) with four screws (Figure 2, Item 5).
M3081DAA
5
4
3
2
1
2
6
Figure 2.
Blackout and Emergency Light Fixtures Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install emergency and blackout lamps. (WP
0624)
2.
Connect battery ground cables. (Volume 2, WP
0350)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-4
0644
0644-2


Back to Top