INSTALLATION - Continued
5.
Connect six wires (Figure 4, Items 1 and 10) to six switch leads (Figure 4, Items 2 and 3) with six insulated
wire splices (Figure 4, Item 5).
6.
Connect six wires (Figure 4, Items 11 and 12) to six switch leads (Figure 4, Items 7 and 8) with six insulated
wire splices (Figure 4, Item 9).
7.
Install covers (Figure 4, Items 4 and 6) on air conditioner starter switch boxes (Figure 4, Items 13 and 14).
M3085DAA
13
14
1
2
3
4
5
6
7
8
9
10
11
12
9
Figure 4.
Air Conditioner Switch.
END OF TASK
FOLLOW-ON MAINTENANCE
Connect battery ground cables. (Volume 2, WP
0350)
END OF TASK
END OF WORK PACKAGE