INSTALLATION
1.
Install wire (Figure 2, Item 5) on light fixture body (Figure 2, Item 9) with nut (Figure 2, Item 7), lockwasher
(Figure 2, Item 6), and screw (Figure 2, Item 1).
2.
Install two wires (Figure 2, Items 2 and 4) with insulated wire splices (Figure 2, Item 3).
3.
Install light fixture body (Figure 2, Item 9) on van ceiling (Figure 2, Item 10) with 20 screws
(Figure
2,
Item
8).
M3090DAA
8
9
10
1
2
3
4
5
6
7
Figure 2.
Fluorescent Light.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Connect battery ground cables. (Volume 2, WP
0350)
2.
Install fluorescent light tubes. (WP
0623)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-4
0646
0646-3/4 blank