INSTALLATION - Continued
8.
Connect two plugs (Figure 4, Item 2) to heater (Figure 4, Item 4).
9.
Install two grommets (Figure 4, Item 3) on wiring harness (Figure 4, Item 5) and van ceiling (Figure 4, Item 1).
10.
Install 12 clamps (Figure 4, Item 7) on wiring harness (Figure 4, Item 5) and van ceiling (Figure 4, Item 1) with
12 screws (Figure 4, Item 6).
M4049DAA
1
4
2
3
5
6
7
Figure 4.
Van Heater Wiring Harness Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install ceiling filler and side panels.
2.
Connect battery ground cables. (Volume 2, WP
0350)
END OF TASK
END OF WORK PACKAGE