FIELD MAINTENANCE
BOOM REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
Tool Kit, General Mechanic's: Automotive
(Volume 5, WP
0826, Table 1, Item 56)
Chain Assembly
(Volume 5, WP
0826, Table 1, Item 15)
Lifting Device
Multiplier, Torque
(Volume 5, WP
0826, Table 1, Item 35)
Wrench, Torque, Click, Ratcheting, 1/2" Drive,
250 Ft-Lb
(Volume 5, WP
0826, Table 1, Item 63)
Wrench, Torque, Click, Ratcheting, 3/8" Drive,
75 Ft-Lb
(Volume 5, WP
0826, Table 1, Item 62)
Materials/Parts
Cap Set, Protective, Dust and Moisture Seal
(Volume 5, WP
0825, Table 1, Item 13)
Materials/Parts (cont.)
Locknut (Volume 5, WP
0827, Table 1, Item 324)
Qty:
1
Lockwasher
(Volume 5, WP
0827, Table 1, Item 405)
Qty:
2
Personnel Required
(2)
References
Volume 5, WP
0820
Equipment Condition
Parking brake set. (TM 9-2320-272-10)
Boom floodlight wire removed.
(Volume 2, WP
0331)
Hydraulic oil reservoir drained. (WP
0703)
Hoist winch removed. (WP
0696)