FOLLOW-ON MAINTENANCE
1.
Install boom floodlight wire. (Volume 2, WP
0331)
2.
Fill hydraulic oil reservoir to proper level. (Volume 5, WP
0820)
3.
Lubricate boom. (Volume 5, WP
0820)
4.
Install hoist winch. (WP
0696)
5.
Operate boom through full range of motion and check for leaks and proper movement. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-4
0686
0686-6