TM-9-2320-272-24-2

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL; VOLUME 2 OF 4

JUNE 1998

  TM-9-2320-272-24-2 - Page 538 of 991

TM
9-2320-272-24-2
3-442. VEHICLE TIEDOWN KIT REPLACEMENT
THIS TASK COVERS:
a. Removal
b. Installation
APPLICABLE
MODELS
REFERENCES (TM)
All
TM 9-2320-272-10
TOOLS
TM 9-2320-272-24P
General mechanic’s tool kit (Appendix E, Item 1)
EQUIPMENT CONDITION
MATERIAL/PARTS
Parking brake set (TM 9-2320-272-10).
Twenty-four locknuts (M923, M924, M929,
M931, M936) (Appendix D. Item 309)
Twenty-eight locknuts (M925, M926, M930,
M932) (Appendix D, Item 309)
Thirty-two locknuts (M927, M934) (Appendix D,
Item 309)
Thirty-six locknuts (M928) (Appendix D,
Item 309)
NOTE
Left and right side tiedowns are replaced the same. This procedure
covers left-side tiedowns.
NOTE
Depending on vehicle model, as few as 12, or as many as 18,
tiedowns may exist.
Tiedowns are located alongside vehicle frame rail.
All vehicles have two tiedowns installed with spacers. Mark
position for installation.
Remove nine locknuts (2), washers (1), screws (5), spacers (3), and tiedown (6) from left side frame rail (4).
Discard locknuts (2) and remove spacer (3) as required.
Install spacers (3) as required and tiedowns (6) on left-side frame rail (4) with two screws (5), washers (1),
and new locknuts (2).
3-1146


Back to Top