TM-9-2320-272-24-3

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL; VOLUME 3 OF 4

JUNE 1998

  TM-9-2320-272-24-3 - Page 716 of 799

TM 9-2320-272-24-3
4-210. TRANSMISSION POWER TAKEOFF (PTO) CONTROL CABLE (M939A2)
REPLACEMENT (Contd)
b. Installation
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Insert PTO control cable (11) through hole in firewall (1).
Place grommet (13) on PTO control cable (11) and install on firewall (1).
Install cable clevis (8) on control cable (11). Tighten nut (10) against cable clevis (8).
Install PTO control cable (11) on control lever (3) with clevis pin (9), washer (7), and new cotter
pin (4).
Install spacer (14) and PTO control cable (11) on shift panel (2) with clamp (15), two screws (16),
and nuts (12).
Install access cover (6) on shift panel (2) with six screws (5).
NOTE
Perform step 7 if bracket was removed.
Install bracket (23) on PTO (28) with two screws (19).
Install cable pin (17) on PTO control cable (11). Tighten nut (18) against cable pin (17).
Install PTO control cable (11) on select lever (25) with washer (26) and new cotter pin (27).
Install spacer (20) and PTO control cable (11) on bracket (23) with clamp (21), two screws (22), and
new locknuts (24).
4-980


Back to Top