TM 9-2320-272-24-3
4-211. TRANSMISSION POWER TAKEOFF (PTO) REPLACEMENT
THIS TASK COVERS:
a. Removal
b. Installation
INITIAL SETUP:
APPLICABLE MODELS
M925, M928, M929, M930, M932, M936
TOOLS
General mechanic’s tool kit (Appendix E, Item 1)
MATERIALS/PARTS
Cotter pin (Appendix D, Item 84)
Locknut (Appendix D, Item 288)
Gasket (Appendix D, Item 238)
Cap and plug set (Appendix
C,
Item 14)
Lubricating oil (Appendix C, Item 48)
Antiseize tape (Appendix
C,
Item 72)
REFERENCES (TM)
LO 9-2320-272-12
TM 9-2320-272-10
TM 9-2320-272-24P
EQUIPMENT CONDITION
l
Parking brake set (TM 9-2320-272-10).
l
Transmission PTO-to-hydraulic pump propeller
shaft removed (para. 3-334).
l
Transmission oil dipstick tube removed (para. 3-3).
a. Removal
1.
Open transmission dipstick access door (1) on inside of cab (TM 9-2320-272-10).
2.
Remove two nuts (3), screws (8), clamp (7), and spacer (5) from PTO cable bracket (4).
3.
Remove cotter pin (12) and washer (11) from PTO cable pin (9), and lift PTO cable pin (9) away from
select lever (10). Discard cotter pin (12).
4.
Tie PTO cable (6) clear of work area.
5.
Remove screw (16), washer (15), and bracket (4) from PTO (19).
6.
Remove screw (17), washer (18), two screws (14), and washers (13) from PTO (19) and
transmission (2).
4-982