TM 9-2320-272-24-3
4-211. TRANSMISSION POWER TAKEOFF (PTO) REPLACEMENT (Contd)
7.
Install two washers (24), screw (25), washer (29), and screw (28) on PTO (30) and
transmission (1).
8.
Install PTO cable bracket (15) on PTO (30) with washer (26) and screw (27).
9.
Install PTO cable (19) and PTO cable pin (20) on PTO select lever (21) with washer (22) and new
cotter pin (23).
10.
Install spacer (16) and clamp (17) on PTO cable bracket (15) with two screws (18) and nuts (14).
FOLLOW-ON TASKS:
l
Install transmission PTO-to-hydraulic pump propeller shaft (para. 3-334).
l
Install transmission oil dipstick tube (para. 3-3).
l
Fill transmission to proper oil level (LO 9-2320-272-12).
l
Start engine, check for leaks, and proper operation of transmission PTO
(TM 9-2320-272-10).
4-987