TM 9-2320-280-20-3
D - 9 8
Change 1
Section II.
I L L U S T R ATED MANUFACTURING INSTRUCTIONS (Cont'd)
Figure D-110. Mini-box Top Section Drill Procedure (Cont’d).
INSTRUCTIONS (CONT’D):
4.
Using data mark set, mark location of thirteen holes (1) on mini-box top section (3).
5.
Using data mark set, mark location of six holes (9) on mini-box top section (3).
6.
Install tip jack (10) and nut (8) in hole (9) marked 2 on mini-box top section (3).
7.
Install five tip jacks (4) with wires (5) and nuts (6) in holes (9) marked 1, 3, 4, 5, and 6 on mini-box
top section (3).
8.
Install five terminal lugs (7) to wires (5) on tip jacks (4).
9.
Install thirteen LEDs (2) in holes (1) marked 1 through 13 on mini-box top section (3).
10.
Cut electrical insulation sleeving (13) into twenty-five sections as shown.
11.
Place twelve sections of electrical insulation sleeving (13) over red (+) wires (11) marked 2, 3, 4, 5, 6,
7, 8, 9, 10, 11, 12, and 13 on LEDs (2).
12.
Place thirteen sections of electrical insulation sleeving (13) over black (–) wires (12) marked 1, 2, 3,
4, 5, 6, 7, 8, 9, 10, 11, 12, and 13 on LEDs (2).
I T E M
M AT E R
I A L S
N O .
R E Q ’ D
D E S C R
I P T
I O N
N S N
1
Data Mark Set
1
Data Mark Set
2
13
Led
3
1
Mini-Box (top section)
4
5
Tip Jack (assembled in figure D-109)
7
5
Terminal Lug
10
1
Tip Jack
13
25
Insulation Sleeving:
1 in.