TM-9-2320-328-13-P-1

HEMTT-BASED WATER TENDER (HEWATT)

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST); PART 1 OF 3

MARCH 2009

  TM-9-2320-328-13-P-1 - Page 539 of 1318

TM 9-2320-328-13&P-1
0064-11
DRAFT
0064
HWT2960
Step 13.
Open pump operator’s panel (WP 0207).
Disconnect pump operator’s panel wire
harness water level gauge connector.
With a test lead set, check for continuity across
wire 2330 (blue) from pump house wire harness relay P1, terminal 2 to pump operator’s
panel wire harness water level gauge connector, terminal 5.
If there is continuity, replace pump operator’s panel water level
gauge (WP 0212).
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION


Back to Top