TM-9-2320-328-13-P-2

HEMTT-BASED WATER TENDER (HEWATT)

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST); PART 2 OF 3

MARCH 2009

  TM-9-2320-328-13-P-2 - Page 1059 of 1390

TM 9-2320-328-13&P-2
0284-1
DRAFT
0284
FIELD LEVEL MAINTENANCE
DISCHARGE VALVE CONTROL WIRE HARNESS REPLACEMENT
INITIAL SETUP:
REMOVAL
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
Discharge valve control wire harnesses are routed from pump house to pump operator’s
panel assembly.
Note position and remove split loom, cushion clips, and cable ties as required.
Note routing of discharge valve control wire harness prior to removal to ensure proper
installation.
Tag and mark connectors prior to removal to ensure proper installation.
Driver side and passenger side discharge valve control wire harnesses are removed the
same way.
Driver side shown.
1.
Disconnect discharge valve control wire harness connector (1) from discharge valve control connector (2).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
HWT1934
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0398, Item 17)
Materials/Parts
Tags, Identification (WP 0400, Item 23)
Ties, Cable, Plastic (WP 0400, Item 26)
Personnel Required
MOS 63B Wheeled Vehicle Mechanic (2)
References
WP 0391, Fig. 34
Equipment Conditions
Pump operator’s panel opened (WP 0207)
Pump house panel E or G removed (WP 0339)


Back to Top