TM 9-2320-328-13&P-2
0302-1
DRAFT
0302
FIELD LEVEL MAINTENANCE
PUMP HOUSE WIRE HARNESS REPLACEMENT
INITIAL SETUP:
REMOVAL
NOTE
•
Tag and mark wires prior to removal to ensure proper installation.
•
Note routing of pump house wire harness prior to removal to ensure proper installation.
•
Note position and remove cable ties, split loom, and cushion clips as required.
1.
Disconnect pump house wire harness connector (1) from discharge pressure transducer connector (2).
2.
Disconnect pump house wire harness connector (3) from intake pressure transducer connector (4).
3.
Disconnect pump house wire harness (5) from intake vacuum transducer connector (6).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
HWT2232
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0398, Item 17)
Materials/Parts
Tags, Identification (WP 0400, Item 23)
Ties, Cable, Plastic (WP 0400, Item 26)
Lockwasher (1)
Lockwasher (1)
Locknut (1)
Locknut (4)
Lockwasher (4)
References
TM 9-2320-325-14&P
WP 0391, Fig. 18, 55
Equipment Conditions
Pump house panel A, E, G, H, and K
removed (WP 0339)
Reel rewind switch removed (WP 0253)
Hose reel removed (WP 0247)