TM-9-2320-328-13-P-2

HEMTT-BASED WATER TENDER (HEWATT)

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST); PART 2 OF 3

MARCH 2009

  TM-9-2320-328-13-P-2 - Page 1299 of 1390

TM 9-2320-328-13&P-2
0314-7/(8 blank)
DRAFT
0314
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
15. Connect electric motor connector (1) on electric motor wire harness connector (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install flow sensor (WP 0250)
2.
Install discharge pressure transducer (WP 0245)
3.
Install pump house panels C and E (WP 0339)
END OF TASK
END OF WORK PACKAGE
HWT0145


Back to Top