TM 9-2320-328-13&P-2
0137-7/(8 blank)
DRAFT
0137
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2.
Install three washers (3), lockwashers (2), and screws (1) on shroud C (4) and vehicle.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install hydraulic heat exchanger bottom shroud panel (WP 0135)
2.
Install pump house panel K (shrouds B and C) (WP 0135)
3.
Install pump house panel G (shrouds A and B) (WP 0135)
END OF TASK
END OF WORK PACKAGE
HWT2022