TM 9-2320-328-13&P-2
0137-1
DRAFT
0137
FIELD LEVEL MAINTENANCE
HYDRAULIC HEAT EXCHANGER SHROUD REPLACEMENT
INITIAL SETUP:
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SHROUD A REMOVAL
1.
Remove two nuts (1), lockwashers (2), four washers (3), and two screws (4) from shroud A (5) and
shroud B (6).
Discard lockwashers.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
HWT2016
HWT2017
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0398, Item 17)
Materials/Parts
Adhesive, Thread, Locking (WP 0400, Item 6)
Tags, Identification (WP 0400, Item 23)
Lockwasher (18)
References
WP 0391, Fig. 8
Equipment Conditions
Pump house panel G removed
(shrouds A and B) (WP 0339)
Pump house panel K removed
(shrouds B and C) (WP 0339)
Hydraulic heat exchanger bottom shroud panel
removed (WP 0135)