TM 9-2320-328-13&P-2
0152-14
DRAFT
0152
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
24. Install PTO yoke (4) on pump (5) with four screws (3), lockwashers (2), and nuts (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install hydraulic reservoir (WP 0148)
2.
Install pump house panel G (WP 0339)
3.
Fill foam system (WP 0022)
4.
Install propeller shafts from transmission to transfer case and transfer case to No. 2
axle (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
HWT1710