TM 9-2320-328-13&P-2
0155-3/(4 blank)
DRAFT
0155
3.
Lightly lubricate preformed packing (16) with clean oil, and install preformed packing (16) and elbow (7) on
valve body (13).
4.
Lightly lubricate preformed packing (15) with clean oil, and install preformed packing (15) and tee (4) on valve
body (13).
5.
Install valve body (13) on bracket (14) with two screws (12), lockwashers (11), and nuts (10).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
6.
Install hose (8) on elbow (9).
7.
Install hose (6) on elbow (7).
8.
Install hose (5) on tee (4).
9.
Install hose (3) on tee (4).
10. Connect main wire harness connector (2) on solenoid connector (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
HWT2012